Maintenance of 48 km of roadbed rehabilitated by Backus

With support from Backus, we executed the project Preventive and corrective maintenance of 48.94 km of rehabilitated amunas in four communities in the Santa Eulalia River sub-basin. This project responds to the need to ensure the proper functioning of the rehabilitated amunas between 2018 and 2024 with funding from our partner, being that they are ancestral infrastructures that remain exposed to extreme weather conditions and natural wear since the beginning of their operations.

 

Its execution was carried out in coordination with the rural communities of San Pedro de Casta, San Lorenzo de Huachupampa, Santiago de Carampoma and San Juan de Iris. Preventive maintenance included the removal of weeds, de-silting of catchment points and improvement of natural infiltration areas. Corrective maintenance included the repair of damaged sections, the reinforcement of critical sectors, the recovery of hydraulic infrastructure and the treatment of erosion areas (gullies).

Year: 2025

Location: Districts of San Pedro de Casta, Huachupampa, San Juan de Iris and Carampoma (Huarochirí, Lima).

Maintenance of 48 km of roadbed rehabilitated by Backus

Our objective

To reduce the gap of unconditioned surface area for water recharge from precipitation.

We did it! These were the goals achieved!

Meta 1

5 million m3 of water secured as a result of maintenance.

Meta 2

25 moons serviced with preventive and corrective maintenance.

Meta 3

48.94 km of operating amunas.

Meta 4

4 farming communities involved.

Meta 5

Green jobs generated on a temporary basis.