With support from The Coca-Cola Company, we executed the project Preventive and corrective maintenance of 9.96 km of rehabilitated amunas in two communities in the Santa Eulalia river sub-basin. This project responds to the need to guarantee the proper operation of the rehabilitated amunas between 2022 and 2024 with financing from our partner, since they are ancestral infrastructures that have been exposed to extreme weather conditions and natural wear and tear since the beginning of their operations.

Its execution was carried out in coordination with the rural communities of San Pedro de Casta and Quilcamachay-Vicas. The work performed included preventive maintenance, which included the removal of weeds, de-silting of the catchment points and improvement of the natural infiltration areas. Corrective maintenance included the repair of damaged sections, the reinforcement of critical sectors, the recovery of hydraulic infrastructure and the treatment of erosion areas (gullies).

 

Year: 2025

Location: Districts of San Pedro de Casta and Huachupampa (Huarochirí, Lima)

Maintenance of 9 km of rehabilitated amunas rehabilitated by Coca-Cola

Our objective

To reduce the gap of unconditioned surface area for water recharge from precipitation.

We did it! These were the goals achieved!

Meta 1

1 million m3 of insured product from maintenance.

Meta 2

4 moons attended with preventive and corrective maintenance work.

Meta 3

9.96 km of operational moons.

Meta 4

2 farming communities involved.

Meta 5

Green jobs generated on a temporary basis.